Preloader

Loading

Senior Airport Construction Scheduling Manager – AECOM

Job Information

  • icon
    No. of Openings 1 opening
  • icon
    Job Experience : 10-15+years

Job Description

Company Description

At AECOM, we’re delivering a better world.

We believe infrastructure creates opportunity for everyone. Whether it’s improving your commute, keeping the lights on, providing access to clean water or transforming skylines, our work helps people and communities thrive.

Our clients trust us to bring together the best people, ideas, technical expertise and digital solutions to our work in transportation, buildings, water, the environment and new energy. We’re one global team – 47,000 strong – driven by a common purpose to deliver a better world.

About Construction Management – AECOM Hunt

Founded in 1944, AECOM Hunt has earned a reputation for being unconditionally client-focused – delivering construction projects on schedule and within budget, no matter the scope. From iconic stadiums and arenas to next-gen transportation hubs to sustainable healthcare and academic buildings, AECOM Hunt deploys the latest technologies, industry-leading safety best practices, and highest ethical standards on every project.

AECOM Hunt has proven time and again to be industry pioneers in delivering the most challenging projects by emphasizing quality and skill-utilization in all that we do. As evidenced by our long list of repeat clients, we focus on specific needs to create strong relationships and consistently exceed expectations.

Job Description

AECOM Hunt is seeking to hire an experienced Construction Senior Scheduling Manager with Airport Construction experience to support our ongoing construction project at JFK airport in the New York City area.

Job Summary:
• Skilled in the development of commercial strategies. Capable of participating in negotiations.
• Requires a demonstrated ability to effectively lead the project controls function on a medium to large project.
• Documents employee performance issues and plays an instrumental role in resolution as appropriate.
• Assumes mentoring and training roles as requested and identifies high potential employees to management.
• Conducts root cause analysis.
• Drafts comprehensive project procedures.
• Possesses proven knowledge of scope control and change management.
• Utilizes extensive knowledge of construction contracting including the manner in which contract type effects implementation of project controls systems.
• Reviews performance trends, prepares analysis and cost impact and monthly project performance reports, and recommends contractor invoices for approval.
• Evaluates manpower, labor hour, and labor cost requirements versus budget limitations.
• Oversees the production and maintenance of accurate project schedules.
• Expert understanding of schedule resource loading and leveling.
• Assists the Project Manager in budgeting and managing incentive programs.
• Holds an expert understanding of schedule, critical path analysis, resource loading and leveling.
• Establishes and maintains client relationships.
• Has the ability to review and analyze project program and oversee the production of accurate progress/performance reports.
• Able to review and assess (as required) raw data that comes from project automated systems.
• Serves as a key participant in client and/or subcontractor negotiations.
• Participates in staffing decisions for projects.
• Ensures that a tracking database is developed and maintained to cross check subcontractor funding is aligned with work authorization and expenditures.
• Involved in tracking system to ensure that Project Management team is fully aware of detailed change order status.

Qualifications

Minimum Qualifications:
• BA/BS + 10 years of relevant construction experience in Scheduling including 2 years of leadership experience or demonstrated equivalency of experience and/or education.
• Airport experience is required.

Preferred Qualifications:
• 8-10 years of experience working as a Construction Scheduler with specific experience in Airport/Aviation projects.
• Experience in managing/leading Scheduling Teams.
• Advanced proficiency in Primavera P6.
• Experience working for a large GC on contracts in excess of 1 MM.
• Experience in project controls and cost estimating in the public sector.
• Microsoft office (Excel, Word, Outlook, Teams) proficiency
• OSHA 10.
• Offered rate of compensation (New York City only) will be based on individual education, qualification, experience and work location. The salary range for the position is $153,525.49/annually – $294,022.16/Annually (exempt).

Additional Information
• This position does not include sponsorship for United States work authorization.
• This position may include relocation.
• Some travel may be required.
• Remote work is unavailable for this position.

All your information will be kept confidential according to EEO guidelines.

With infrastructure investment accelerating worldwide, our services are in great demand, and there’s never been a better time to be at AECOM! Join us, and you’ll get all the benefits of being a part of a global, publicly traded firm – access to industry-leading technology and thinking and transformational work with big impact and work flexibility.

AECOM provides a wide array of compensation and benefits programs to meet the diverse needs of our employees and their families. We also provide a robust global well-being program. We’re the world’s trusted global infrastructure firm, and we’re in this together – your growth and success are ours too.

As an Equal Opportunity Employer, we believe in each person’s potential, and we’ll help you reach yours.

Join us and let’s get started.

Job alerts

Receive emails for the latest jobs matching your search criteria

Uploading
Color SWITCHER